NOTICE OF PUBLIC HEARING. PLEASE TAKE NOTICE THAT THE BOARD OF TRUSTEES OF THE INC. VILLAGE OF LAKE SUCCESS WILL HOLD A PUBLIC HEARING AT THE LAKE SUCCESS COMMUNITY BUILDING, 318 LAKEVILLE ROAD, GREAT NECK, NY 11020 ON NOVEMBER 13, 2023 AT 7:30PM, UPON THE REQUEST OF ADOPTION FOR THE FOLLOWING PROPOSED BILL:BILL NO. 7, LOCAL LAW NO. 6 OF 2023 a local law to amend Lake Success Code Ch.ß105-35 Disapproval of application for building or alteration permit. C. Rooftop Solar Power Systems. 1. Applicability. The Planning Board shall have jurisdiction over all applications for rooftop solar power systems. This section applies to all rooftop solar power systems proposed to be constructed after the effective date of this section.2. Administration. a. The fee for any rooftop solar power system application shall be the same as for a building permit. b. Applicant shall submit 10 sets of a roof plan, drawn to scale, depicting the array of panels, tiles or slates on the roof materials, and proposed panels, tiles or slates on the roof.3. Purpose: No rooftop solar power system shall be erected or installed unless the system is designed to comply with the installation requirements noted below and meets all standards of the Village and New York State Building Code. The applicant shall appear before the Planning Board before a permit shall be issued by the Building Inspector.4. Installation. Installation of any rooftop solar power system shall conform with the following requirements: a. Placement shall be flush or flat mounted as close as practical on a gabled, hipped or mansard roof, not to exceed six inches, with no extension above the roof. The Planning Board shall consider the geometry, massing and overall aesthetic of the roof with regard to placement of the proposed panels, tiles or slates. b. Heat-storing masses and ground mounted solar collector systems are prohibited. c. If an applicant installs a new roof contemporaneous with its solar power system, all solar panels shall match the color of the new roof to the greatest extent possible. If an application proposed to install its solar power system on an existing roof, variations between the color of the solar panels and the color of the existing roof will not be considered a factor against approval except if solar panel manufacturers offer solar panels in colors that, to the greatest extent possible, match the color of the existing roof.5. Enforcement/Continuing Jurisdiction. Upon completion of the rooftop solar power system installation, the applicant shall schedule an inspection with the Building Department. The Building Inspector shall inspect the premises to confirm that the solar panels and/or other materials were installed in accordance with the approved plan. The Planning Board shall retain jurisdiction over the project. In the event the rooftop solar power system is not installed in accordance with the approved plan, the applicant shall appear before the Planning Board to obtain a modification of the approved plan. If the modification does not conform with the standards of section 4, above, the Planning Board may deny the application for modification and direct the applicant to remove the rooftop solar power system or reinstall it in accordance with the approved plan. A copy of the proposed law is available for inspection at the Village Office weekdays between the hours of 9am and 4pm.  At the time and place of the public hearing, all persons will be given an opportunity to be heard. Those persons requiring listening devices and/or a language translator are requested to notify the Village Clerk no less than 48 hours prior to the meeting. BY Order of the Board of Trustees, Adam Hoffman, Mayor, Dated: 11.3.23